Sign In | Join Free | My chinacomputerparts.com
China Haibeisi (Xiamen) Import and Export Co., Ltd. logo
Haibeisi (Xiamen) Import and Export Co., Ltd.
Quality goes hand in hand with service.
Active Member

3 Years

Home > Copper Rod Making Machine >

High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber

Haibeisi (Xiamen) Import and Export Co., Ltd.
Contact Now

High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber

Brand Name : HBS

Model Number : GYT-35

Place of Origin : CHINA

Certification : CE,ISO

MOQ : ≥1Set

Price : USD10000-50000

Packaging Details : Plywood packed with export standard

Delivery Time : 10-15days

Payment Terms : TT,L/C.D/A,D/P

Supply Ability : 50Sets per month

Name : Copper Rod Making Machine

Material : Copper

Cooling Method : Water Cooling

Warranty : 1 Year

Processing Type : Continuous Casting And Rolling

Condition : New

Power Source : Electricity

Voltage : 380V/50Hz

Contact Now

High-Efficiency Copper Rod Making Machine With Power Source Electricity

Product Description

Brass rod making machines are used to produce brass rods of various sizes and specifications. These machines are designed to melt brass scraps or raw brass material and then transform the molten brass into solid rods through a series of processes.

Melting: Brass scraps or raw brass material are melted in a furnace or other heating equipment. The temperature is carefully controlled to ensure the brass is properly melted.

Drawing: In the drawen process, the brass is forced through a die to shape it into a rod with the desired diameter and length. This process helps improve the mechanical properties and surface finish of the brass rod.

Cooling and Cutting: the brass rod is cooled using a water system.After cooled, the rod is cut into the desired lengths using a cutting machine.

Finishing: The cut brass rods may undergo additional processes such as straightening, peeling, or surface treatment to meet specific requirements.

Technical Parameters

SL SPECIFICATION
1 Melting Rate 500kg/h
2 Chamber Capacity 2
3 Temperature Rating 1000-1100℃
4 Total Rated Capacity Of Melting Furance 3000kg
5 Total Rated Capacity Of Holding Furance 40000kg
6 Voltage 380V,50HZ
7 Cos After Compensation 0.95-1
8 Cooling Water Consumption 10m³/h
9 Water Pressure 0.3-0.4Mpa
10 Total Power 250Kw

Support and Services

Copper Rod Making Machine Technical Support and Service
Installation and commissioning

We provide professional installation and commissioning services for Copper Rod Making Machine. Our experienced technicians will provide on-site guidance and installation services to ensure that the equipment is installed correctly and meets the customer's requirements.

Training

We provide professional training services. Our experienced technicians will provide on-site operation and maintenance training to ensure that customers can operate the equipment correctly and safely.

Maintenance and repair

We provide professional maintenance and repair services. Our experienced technicians will provide on-site maintenance and repair services to ensure that the equipment is running properly and efficiently.

Spare parts supply

We provide professional spare parts supply services. Our experienced technicians will provide a complete list of spare parts for customers to ensure that customers have enough spare parts for maintenance and repair.

Applications

High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamberHigh Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber

High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamberHigh Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber

Packing and Shipping

High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber

FAQ

1.COULD YOU ARRANGE THE ENGINEER FOR INSTALLATION AND COMMISSIONING?

A:Obviously yes,but the buyer pay the charges.

2.HOW TO CHOOSE ROD MAKING MACHINE?

A:It depends on your daily/monthly production required.(Contact us for the details)

3.DO YOU PROVIDE ANY SPARE PARTS WITH THE MACHINE?

A:Yes,we will provide some common parts for you according to our packing list(cotact us for packing list)

4.WHAT IS THE DELIVERY PERIOD AFTER PLACING THE ORDER?

A:Normally 15-20days after deposit..

5.WHAT IS THE WARRANTY PERIOD AND AFTER-SERVICE FOR YOUR MACHINE?

A:1 year warranty for components and life-long technical supports(details depends on the warranty rules)


Product Tags:

High Efficiency Copper Rod Making Machine

      

Copper Rod Making Machine 0.3Mpa

      
China High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber factory

High Efficiency Copper Rod Making Machine 0.3Mpa-0.4Mpa with 2 chamber Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Haibeisi (Xiamen) Import and Export Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)